Our systems are all designed on a project specific basis. We save on cost by implementing generic anchor products; and when the need arises we are able to develop a customised solution in consultation with both builder and architect.
We use industry standard 3D Design tools to allow accurate design and communication of customised solutions. Our systems are simple in both design and in use to provide both cost and time savings.
Our construction relationships always involve repeat business!
OUR WORK
101 Bay St Port Melbourne
Architect: Plus Architecture
Builder: Hickory Developments - Life Built
Completed: Oct 2012101 Bay St Port Melbourne
One of the largest concerns on the project at 101 Bay St was the problem of window cleaners landing on penthouse balconies – thus reducing the property value. The customised beam shown pivots on a large axis to reach 4 abseil points and solved the concern of landing on balconies, thus avoiding significant profit reduction!
This particular building includes 56 floor set anchors, 15 inverted anchors used to access under-hangs, and 1 fully customised beam. The builders also requested around 35 temporary anchors to be used in conjunction with window installation. Resourcity designed, fabricated, installed and certified all systems.
The Vogue - Chapel Street South Yarra
Architect: The Buchan Group
Builder: Hickory Developments
Completed: Dec 2011The Vogue – Chapel Street South Yarra
At 31 storeys high The Vogue in South Yarra was the most challenging project that Resourcity had undertaken to date. Resourcity designed a system of abseiling and roof access that met all of the complex project problems including; a curved height building crown, installation of anchors below paving, and rigging ropes over glazed edges.
A customised davit system was developed. To make relocating the davit possible around the crown gantry and caged ladder it was built of lightweight material.
This building consists of 44 Davit points on the steel gantry, 44 Lateral restraints (at the half-abseil mark), 3 horizontal lifelines, 55 anchors beneath paving, 60 Floor set anchors, and 26 inverted anchors – used to access under-hangs. Resourcity was also asked by the builder to rig up a protective catch net over a glazed atrium, which is now part of the shopping centre below.
Alt Apartments - Flemington
Architect: Fender Katsalidis Architects
Builder: Hickory Developments - Life Built
Completed: May 2012Alt Apartments - Flemington
Alt Apartments was the third; and largest building stage on the Flemington road site. Building on our long-term relationship with Hickory Developments, Resourcity worked closely with Fender Katsalidis Architects to develop a simplified – over parapet abseil system including structural steel parapet guides that doubled in areas as rooftop guard railing.
This particular building includes 77 floor set anchors with associated parapet guides, 35 Lateral restraints (at the half-abseil mark), and 4 inverted anchors to be used to access under-hangs. Builders, Architects, and finally the owner's corporation have been very satisfied with the result.